§ 6.00.09. Erosion control plan.  


Latest version.
  • Proposed temporary and permanent erosion and sediment control plans shall be submitted with each application for construction plan approval. These plans shall specify in detail the erosion and sedimentation control measures to be used during all phases of clearing, grading, filling, site construction, and permanent development, and accurately describe their proposed operation. In addition, these plans shall be in accordance with the county engineer's guidance or the latest applicable specifications and recommendations as contained in the Florida Department of Environmental Protection's (FDEP's) publication, "The Florida Stormwater, Erosion and Sedimentation Control Inspector's Manual" latest edition. Copies of this publication can be obtained from FDEP. All erosion control plans will be reviewed and approved by the public works department except for single family and duplex dwellings.

    No clearing, grading, excavating, filling, or other disturbance of the natural terrain shall occur until county-approved erosion and sedimentation control measures have been installed, except those operations needed to implement these measures. All erosion and sedimentation control measures shall be maintained throughout the length of construction activity.

(Ord. No. 11-01, § 2, 1-18-11)