Water user or sewage discharge permits are issued to a specific user for a specific
operation. A water user or sewage discharge permit shall not be reassigned or transferred
or sold to a new owner, new user, different premises, or a new or changed operation
without the approval of the board. Any succeeding owner or user shall also comply
with the terms and conditions of the existing permit.
Each user must notify the director of any significant changes to the user's operations
or system which might alter the nature, quality, or volume of its wastewater at least
90 days before the change. The director may require the user to submit such information
as may be deemed necessary to evaluate the changed condition, including the submission
of a wastewater discharge permit application under section 24-132 of this article.
(
Ord. No. 16-16
, § 1, 9-6-16)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');